telefon +36 74 550 540
telefon info@knipl.com
Facebook
Twitter
Tweets by KniplKft
Youtube
Blogger

Task of this plant is to increase the drying speed of the painted parts. The construction depends on the technological demands. In case of the more energy effective function of the plant we fit the continuous system with entry and exit air curtain and systems with tact operation with doors. The structure of the plant (panel elements) has min. 3 layers and mineral wool isolation with 120 kg/m3 consistence. The structure is made with panel connection protection, so we can minimise heat loss.  

« Back